The AASHTO LRFD Bridge Construction Specifications, Third Edition, contains the subsequent thirty two sections:
1. Structure Excavation and Backfill
2. Removal of Existing Structures
3. Temporary Works
4. Driven Foundation Piles
5. trained Shafts
6. Ground Anchors
7. Earth-Retaining Systems
8. Concrete Structures
9. Reinforcing Steel 10. Prestressing 11. Steel Structures 12. Steel Grid Flooring
13. Painting 14. Stone Masonry 15. Concrete Block and Brick Masonry
16. Timber Structures 17. Preservative Treatment of Wood 18. Bearing Devices 19. upper deck Joint Seals
20. Railings 21. Waterproofing 22. Slope Protection 23. Miscellaneous Metal
24. Pneumatically Applied Mortar 25. Steel and Concrete Tunnel Liners
26. Metal Culverts 27. Concrete Culverts 28. carrying Surfaces 29.
Embedment Anchors 30. Thermoplastic Pipe 31. Al Structures 32. Shock Transmission Units
-
SmartPLS 4 Processional | Lifetime activation$110.00
-
EndNote Lifetime for Windows /Mac Software Full Version$8.00 – $10.00
-
IBM SPSS Statistics [Lifetime]$10.00 – $25.00
-
LinkedIn ALL COURSES LIFETIME Warranty$40.00
-
Product on saleREF-N-WRITE | Premium Account Lifetime$22.00
-
QuillBot’s paraphrasing tool | Premium Account 6 month | + WARRANTY$12.00
-
Plagiarism Checker – 6 Month | 1 Year | 2 Years | 3 Years | 4 Years | LifeTime$6.00 – $55.00