Tube / Pipe Column Design Based on AISC-ASD 9th
Further innovations in the flat tube /pipe column method are now being utilized. On-site precast slabs, apartment size or slightly smaller, are being lifted to form the apartment floors. The slabs for another three – s tory, twelve – unit building are supported on bearing walls. The change from the bearing wall to the pipe […]
Tube / Pipe Column Design Based on AISC-ASD 9th Read More »