Civil MDC

Design Load on Formwork 2

Design Load on Formwork

Design load for formwork are dead load plus live load per square metre of form contact area. The dead load is defined as the weight of the reinforced concrete plus the weight of the formwork.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top