Civil MDC

Drilled Cast-in-place Pile Design Based on ACI 318-02 2

Drilled Cast-in-place Pile Design Based on ACI 318-02

Cast-In-Drilled-Hole (CIDH) piles are commonly used in the construction of bridge structures, and refer to a construction method in which the reinforced concrete piles are cast in drilled holes to predetermined elevations using a heavy wall steel casing to prevent caving.

1 thought on “Drilled Cast-in-place Pile Design Based on ACI 318-02”

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top