Report on Design and Construction of Drilled Piers (ACI 336.3R-14) 1

Report on Design and Construction of Drilled Piers (ACI 336.3R-14)

Description This report addresses design and construction of drilled pier foundations constructed by digging, drilling, or other-wise excavating a hole in the subgrade that is subsequently filled with plain or reinforced concrete. Although structural design and construction of drilled pier foundations are the primary objectives of this report, relevant aspects of geotechnical engineering are also […]

Report on Design and Construction of Drilled Piers (ACI 336.3R-14) Read More »