Wall Pier Design Based on CBC 2001 / IBC 2003 / IBC 2006
Wall pier design is performed at the top and bottom of each pier. Thus, for. wall pier P2 at the Roof level, design is performed at the top and bottom of. the door opening. No design is performed near the midheight of the door.
Wall Pier Design Based on CBC 2001 / IBC 2003 / IBC 2006 Read More »