POST-TENSIONED ANALYSIS & DESIGN to BS EN 1992-1:2004
Post-tensioned concrete means that the concrete is poured and then the tension is applied-but it is still stressed before the loads are applied so it is still prestressed. … The program provides for the ultimate strength and service stress design and analysis of one-way beam and slab and two-way flat plate systems.
POST-TENSIONED ANALYSIS & DESIGN to BS EN 1992-1:2004 Read More »