Civil MDC

Wall Pier Design Based on CBC 2001 / IBC 2003 / IBC 2006 2

Wall Pier Design Based on CBC 2001 / IBC 2003 / IBC 2006

Wall pier design is performed at the top and bottom of each pier. Thus, for. wall pier P2 at the Roof level, design is performed at the top and bottom of. the door opening. No design is performed near the midheight of the door.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top