Civil MDC

Suspended Anchorage to Concrete Based on IBC 2003 2

Suspended Anchorage to Concrete Based on IBC 2003

In suspension bridges, large main cables (normally two) hang between the towers and are anchored at each end to the ground. … The tension on the main cables is transferred to the ground at the anchorages and by downwards compression on the towers.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top